This project involved the successful rehabilitation of 60 kilometers of rural roadway through a multi-year term with another 40 kilometers scheduled for the upcoming season. The scope of work involves the pulling in of material along the sides of the roadways in an effort to reshape and restore the crown of the road while bringing the road back to its proper width and adding strength through subgrade preparation. Spanning from spring to late summer, crews continuously worked through varying and challenging weather conditions. Despite navigating utilities and heavy traffic, our dedicated team delivered ahead of schedule and under budget, showcasing our commitment to efficiently and excellence.

EQUIPMENT UTILIZED

RTRC succesfully completed the shoulder pull program, with 1 – 14M Grader, 1 – 160M Grader, 1- 815 Packer, 1 – Padfoot Packer and a Tractor and Disc. 

We operate a fresh, modern fleet of heavy equipment with GPS capabilities for the most intricate railroad construction and maintenance jobs. Our modern equipment ensures quick and smooth operations with limited downtime, attracting only the top heavy equipment operators.

Our modern equipment ensures quick and smooth operations with limited downtime, attracting only the top heavy equipment operators. We operate a fresh, modern fleet of heavy equipment with GPS capabilities for the most intricate railroad construction and maintenance jobs.

GET IN TOUCH